See below for the documents:
Full documentation
EAR
Figures
- EAR - Figure 1.1 - Location Plan
- EAR - Figure 1.2 - Application Boundary
- EAR - Figure 1.3 - Site Selection and Design Evolution
- EAR - Figure 1.4 - Site Layout Plan
- EAR - Figure 1.5 - Site Components
- EAR - Figure 1.6 - General Arrangement
- EAR - Figure 1.7a - View of Development (South and East)
- EAR - Figure 1.7b - View of Development (North and West)
- EAR - Figure 1.8a - Workshop and Warehouse Layout
- EAR - Figure 1.8b - Workshop and Warehouse Elevations
- EAR - Figure 1.9a - Electrolyzer Building Layout
- EAR - Figure 1.9b - Electrolyzer Building Elevations
- EAR - Figure 1.10a - Control and Administration Building Layout
- EAR - Figure 1.10b - Control and Administration Building Elevations
- EAR - Figure 1.11 - Hydrogen Production Facility 3D Model
- EAR - Figure 1.12 - Indicative Cable Trench
- EAR - Figure 1.13 - Compression Building Elevation and Floor Plan
- EAR - Figure 1.14 - Electrical Building Elevation and Floor Plan
- EAR - Figure 2.1 - Site Location and Landscape Context - A3
- EAR - Figure 2.2 - Topography and Landcover - A3
- EAR - Figure 2.3 - Landscape Character - A3
- EAR - Figure 2.4 - ZTV Bare ground - A3
- EAR - Figure 2.5 - ZTV Screening - A3
- EAR - Figure 3.1 - Site Location Plan
- EAR - Figure 3.2 - Statutory Designated Sites
- EAR - Figure 3.3 - Phase 1 Habitat Survey - Main Site Area
- EAR - Figure 3.4 - Phase 1 Habitat Survey - Main Site Area & Site Access
- EAR - Figure 3.5 - NVC Survey
- EAR - Figure 3.7 - Wider Area Habitat Condition
- EAR - Figure 4.1 - Study Areas
- EAR - Figure 4.2 - Bedrock Geology
- EAR - Figure 4.3 - Superficial Geology
- EAR - Figure 4.4 - Soil and Peat
- EAR - Figure 4.5 - Peat Depth
- EAR - Figure 4.6 - GWDTE
- EAR - Figure 4.7 - Hydrology
- EAR - Figure 4.8 - Private Water Supplies
- EAR - Figure 4.9 - Water Quality Monitoring
- EAR - Figure 5.1 - Operational Noise Contours
Technical Appendices
- EAR - Technical Appendix 1.1 - Process Description
- EAR - Technical Appendix 1.2 - Schedule of Mitigation
- EAR - Technical Appendix 1.3 - Outline Decommissioning and Restoration Plan
- EAR - Technical Appendix 1.4 - Scottish Water Horizons Water Supply Feasibility Report
- EAR - Technical Appendix 2.1 LVA Methodology
- EAR - Technical Appendix 2.2 - Visuals Methodology
- EAR - Technical Appendix 2.3 - Landscape Sensitivity
- EAR - Technical Appendix 2.4 - Viewpoint Appraisal
- EAR - Technical Appendix 4.1 - Peat Management Plan
- EAR - Technical Appendix 4.2 - Drainage Impact Assessment
Visualisations
- EAR - Figure 2.6a - VIEWPOINT 1 - Beinn Tharsuinn wind farm access track
- EAR - Figure 2.6b - VIEWPOINT 1 - Beinn Tharsuinn wind farm access track
- EAR - Figure 2.6c - VIEWPOINT 1 - Beinn Tharsuinn wind farm access track
- EAR - Figure 2.7a - VIEWPOINT 2 - B9176
- EAR - Figure 2.7b - VIEWPOINT 2 - B9176
- EAR - Figure 2.7c - VIEWPOINT 2 - B9176
- EAR - Figure 2.8a - VIEWPOINT 3 - B9176, Aultnamain
- EAR - Figure 2.8b - VIEWPOINT 3 - B9176, Aultnamain
- EAR - Figure 2.8c - VIEWPOINT 3 - B9176, Aultnamain
- EAR - Figure 2.9 - VIEWPOINT 4 - Unclassified road west of Balleigh
- EAR - Figure 2.10 - VIEWPOINT 5 - Beinn Tharsuinn
- EAR - Figure 2.11 - VIEWPOINT 6 - Unclassified road at Rhanich
- EAR - Figure 2.12 - VIEWPOINT 7 - B9176, Strathy junction